Wednesday, 16 December 2015
Production log (pre-production)
For the pre-production we've so far planned the plot for the opening of our film, cast the actors and found a location. The plot of the film has been decided through the minor changes made throughout the weeks, we have drawn and written all the information on the story board however that has yet to be changed from the new scenes. The actors have been cast and we are selecting dates that all the cast can begin to film however one of the main actors is unavailable during the Christmas break therefore we are will continue filming without him and then re-film when he is available. Lastly the location was found, we are using the Kingston car park but we just have yet to confirm it with security or anyone in control around when we may be filming. As well as deciding that we will be filming hopefully around the schedules more specifically on Sunday's as from the sound and lighting shots which was filmed on a Sunday, it was more empty although we have chosen on the top outside floor of the car park as we knew it would more likely to be empty throughout the week rather than using the indoor levels which could constantly be busy.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment